SERVICE & PROJECT HANDOVER

Support starts before the machine is shipped.

Geerpower helps define the documentation, shipment handover, installation readiness, training, spare-parts planning and after-sales issue path around the approved machine and project scope.

On-site service, local partner coverage and response arrangements are confirmed per destination and project scope—not assumed from the website.

Injection molding machine loading prepared for project handover
Export handover evidence · exact support inclusions follow the approved commercial scope
01

Defined support boundary

Included activities, buyer responsibilities and destination-dependent arrangements recorded in writing.

02

Site-readiness checklist

Utilities, floor, access, connections, material, mold and personnel inputs organized before arrival.

03

Issue evidence path

Machine identity, symptoms, alarms, settings, photos and video collected for a useful technical review.

SIX SUPPORT CHECKPOINTS

Prepare delivery and support as part of the project.

The practical questions begin before loading. Each checkpoint ties the machine, site, documents and buyer responsibilities to a reviewable project record.

01

Application review

Confirm the product, mold, resin, process and machine configuration before the support scope is defined.

02

Documentation plan

List the agreed manuals, configuration records, packing documents and available technical evidence.

03

Trial evidence

Define available inspection, test or running evidence against the approved machine and project scope.

04

Shipment handover

Record packing, loading, destination, consignee inputs and the agreed transfer point.

05

Installation readiness

Check site utilities, access, foundation or floor conditions, connections and buyer-side preparation.

06

After-sales issue intake

Structure the evidence required to identify the machine, reproduce the issue and review the next action.

SUPPORT RESPONSIBILITY BOUNDARY

Know what is included, dependent or buyer-prepared.

A useful service plan makes the handover boundary visible before the order reaches the destination. It does not replace the approved quotation or contract.

Request the support checklist
Confirmed in writing

The quotation and contract define which documents, checks, training or support activities are included.

Destination-dependent

On-site service, local partner coverage and response arrangements are confirmed per destination and project scope.

Spare-parts planning

Recommended or requested parts, availability, price and lead time are checked case by case.

Buyer site scope

The buyer confirms access, utilities, foundations or floor conditions, lifting, connections, mold, resin and operating personnel.

Technical issue review

Useful diagnosis depends on machine identity, alarm records, parameters, operating conditions, photos and video.

HANDOVER WORKFLOW

Four decisions from destination to issue handling.

01

Define the destination

Share the country, site, project stage and required handover activities.

02

Confirm the handover

Record inclusions, exclusions, evidence, documents and responsibilities.

03

Prepare the site

Close utility, access, mold, material and personnel readiness items.

04

Handle open issues

Submit structured evidence so technical and commercial next steps can be reviewed.

Manufacturing floor used to illustrate machine project preparation

USEFUL SUPPORT EVIDENCE

Give the technical review enough context to act.

A message such as “the machine does not work” is rarely enough. Link the issue to the correct machine, operating state, settings, alarms and observable symptoms.

  • Machine identification and approved configuration
  • Alarm history, parameters and operating conditions
  • Clear photos or video of the issue and sequence
  • Recent changes, attempted actions and current result

SERVICE & SUPPORT FAQ

Clear boundaries before commitment.

Is on-site commissioning available in every country?

It is not assumed. On-site service, local coordination and response arrangements depend on the destination, project scope and the terms confirmed in the approved quotation or contract.

What machine support is included with an order?

Only the documents, checks, training, commissioning or support activities listed in the approved quotation and contract are included. The website describes the review framework, not a universal service package.

What information helps with an after-sales technical review?

Provide the machine model and identification, controller or software information when relevant, alarm history, current settings, operating conditions, a clear issue description, and useful photos or video.

Are spare-parts availability and lead time guaranteed on the website?

No. Part identity, compatibility, availability, price and lead time must be checked for the specific machine and destination before confirmation.

DEFINE THE SUPPORT SCOPE

Share the destination, machine and project stage.

Attach available project files, machine information, site requirements or issue evidence. Geerpower will organize the open delivery and support questions before a commitment is confirmed.

Project briefSupport reviewed against the real project scope
Selected requestDefine GEERPOWER delivery, handover and support scope

Complete one project brief so the new machine and turnkey scope can be reviewed against the same inputs.

Your information is used only to prepare the requested project recommendation. Reference files expire after 30 days.